Pinto Basin Rd. – Joshua Tree National Park

10.47 Miles of Road Repair

Back to Projects

Project Scope

Project Relevance: Re-Construction and repair of 10.47 miles of road. Asphalt pulverization, road survey, road grading, widening, realignment, compaction and testing. Placed over 28,890 tons of FHWA spec Super Pave asphalt, compaction and testing. Provided and assembled gabion and revetment matt’s. Demolish existing curb and provided new Colored curb, sidewalk, cross gutter and handicap ramps. Provided and placed rip rap and erosion control blankets. Managed and provided traffic control throughout the project. Installation of new road signs. Provided and placed Type II road slurry slurry at three different locations with in the park. Provided and placed two coats of striping approx. 115,000 linear feet including two parking lots and 3 different turn outs. Implemented and maintained SWPPP’s. throughout the course of construction, as a project requirement we monitored and protected environmentally sensitive wildlife and vegetation during the construction of the project.

Like what you see? Contact us today and get us on board for your next project. Contact Us