Pad 7 – Edwards AFB

Grading & Pavement Expansion

Back to Projects

Project Scope

Cutting Edge performed all grading and pavement operations for this project. Features include designing an extended pad location between Taxiway Echo and existing fueling area to support F35 hot fueling operations located at Edwards AFB. Concept and final design included addressing drainage concerns and re configuring of existing taxiway lighting. Approximately 1,400 cy of 650 Flex concrete was placed at 15” thick on an approximate area of 225’ x 275’. A total of 750 Tons of asphalt was placed at a 3” depth on all of the shoulders to address FOD concerns.

Like what you see? Contact us today and get us on board for your next project. Contact Us