Naval Air Station – Lemoore, CA

Removal and Replacement of Joint Sealant

Back to Projects

Project Scope

Cutting Edge Concrete Services performed the complete removal and replacement of approx. 46,000 LF of joint sealant within the ramp area of Naval Air Station Lemoore. The existing hot-pour sealant was removed with concrete saws and the sidewalls of the joints were resurfaced and beveled. The joints were then cleaned with hi pressure water blasters and cleaned again with compressed air. A silicone jet fuel resistant sealant was then applied to the prepared surfaces following backer-rod installation. Cutting Edge utilized its in-house equipment such as silicone pumps, water blasters and vacuum sweeper trucks to maintain the site condition.

Like what you see? Contact us today and get us on board for your next project. Contact Us